You don't have javascript enabled. Good luck with that.
Pencarian
Ketua DPRD Dorong Pelaksanaan Normalisasi Sebagai Solusi Banjir

River Normalization must Be Accelerated

City DPRD Chairperson, Prasetio Edi Marsudi has encouraged the Ciliwung-Cisadane Flood Control Office (BBWSCC) to speed up river normalization program in the capital.

The solution is normalization thus some areas can be free from inundation when floodwaters come

"The solution is normalization thus some areas can be free from inundation when floodwaters come," he expressed, Tuesday (2/6).

First Phase Normalization of Krukut River Will Focus on River Deepening

Based on the review results at flood sites in Kebon Baru, Tebet, South Jakarta last night, he assessed, floods in the field were triggered by the overflowing waters of Ciliwung River that has no sheet pile.

"In Kebon Baru, there is an area that is not flooded, precisely behind SMAN 8. This is because its area sheet pile. While for the flooded area is because of not having sheet pile. In conclusion, the river width must be optimal and in accordance with its function," he stated.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1366 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye992 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye829 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye635 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye606 personAldi Geri Lumban Tobing